EVAtlasUSA

Stations shown are marked operating in the federal Alternative Fuel Data Center — a station can still be temporarily down or removed since the last update. Always check the network's own app before a trip.

Home / Georgia / Newnan

Newnan Utilities Wahoo Creek Administration Building

315 Millard Farmer Industrial Blvd, Newnan, GA 30263

DC fast chargers
0
Level 2 chargers
2
Access
public
Network
Non-Networked

Station details

Connector typesJ1772
Access hours8am-5pm M-F
Facility typeUTILITY
PricingFree
Open since2015-06-01
Last confirmed by AFDC2026-08-11
Coordinates33.40016, -84.78589

Other stations nearby

Source: Alternative Fuel Data Center, National Laboratory of the Rockies. Marked operating as of the last confirmation date above — always verify with the network before relying on this charger.

Newnan Utilities Wahoo Creek Administration Building — EV Charging Station | EVAtlasUSA